Surekha Regency
Highlights
- Variety store
- Temple
- Community Hall
- Beautifully Landscaped Garden
- Children’s play area
- Power back up for common areas
- Cable TV network
- 24 hrs water supply through deep bore well
- Lifts in each Block
- Visitors car parking
- Two wheeler parking
- 24 hours security
- Sewarge Treatment Plant
Specifications
Structure : All types of Columns, Beams, Lintel, Chajja & RCC slabs etc, in sub structure & super structure shall be with M-15 & M-20 grade of concrete.
Door Frame : Main door - wooden and all other doors R.C.C./ Wooden Chaukatha.
Brick Work : All Brick work shall be with K.B / concrete Block/Fly Ash Bricks.
Inside Doors : Shutter Decorative seasoned teak wood main door and internal Doors are of Company made flush doors.
Windows : Aluminium Windows with protective M.S .Grill.
Plastering : All inside & outside wall shall be plastered in (1:6) prop. All ceiling area shall be plastered (1:4) prop.
Storage Space : Suitable spaces & sizes shall be provided for Cup - Boards.
Painting : All interior wall surfaces are painted with oil bound distemper and all outside walls with Exterior Emulsion (Weather Proof) paint/Cladding.
Flooring : Vitrified Tiles / Ceramic Tiles / Marble
Electrical : All electrical wiring with premium brand fire resistant insulated copper wire/cable in concealed conduits. Switches & Sockets of Modular range. A.C. Points in all Bed Rooms.
Walls : Ceramic Wall tiles upto 7’-0” height in toilet and upto 2’-0” height in Kitchen. Green marble slab for working top in kitchen with stainless steel kitchen sink.
Sanitary : Hindware / Johnson or equivalent. Hot & cold water provision in all Bath Rooms. C.P. fitting of reputed make.
Floor Plans
PDF File
Location
- Rasulgarh Square from site 4 km
- From Air port 10 km
- From Railway Station 7.5 km
- From Delhi Public School 9 km
- From Main Bus Stand 10 km
- From Hi-Tech Hospital 2.5 km
Payment
- On Application for Booking 10% of the cost
- On execution of Agreement & Allotment 10% of the cost
- On completion of Foundation 20% of the cost + IDC / EDC
- On completion of Stilt floor Roof Slab 10% of the cost + Car Parking
- On completion of First floor Roof Slab 15% of the cost + Corpus Fund
- On completion of Second floor Roof Slab 10% of the cost + PLC
- On completion of Fourth floor Roof Slab 10% of the cost + EC
- On completion of flooring & finishing 10% of the cost + MSC
- Upon completion and Before registration 05% of the cost
PLC – Preferential Location Charges, EC – Electrification Charges, MSC – Maintenance Security Charges, IDC – Internal Development Charges, EDC – External Development Charges.













