Surekha Villa
Highlights
- Standby generator for common utilities like common lights & water supply.
- Water supply by deep borewell through separate over head reservoirs of adequate capacity.
- Separate transformer for electric supply.
- Lift of six persons for comfortable lifting.
- Telephone outlets in each flat.
- Cable TV outlet in each flat.
- Parking space for two wheelers in the stilt floor.
- Car parking space in the stilt floor at cost.
- Adequate ventilation & pollution free environment.
- Security Gates & Boundary wall.
- Security Guard Room.
- Society Room with attached toilet.
Specifications
Super Structure : R.C.C frame structure with Column/beams.
RCC :1:2:4 proportions with ½” to ¾” H.G. chips in footings, beams, Slabs, lintels, staircase etc.Wall Concrete Hollow brick/Kiln Burnt Brick (K.B).
Wall Finishing : All walls to be cement Plastered (1:6) and ceiling Plastered (1:4).
Kitchen : Marble flooring and cooking platform of green Polished marble, stainless Steel sink, ceramic tiles cladding up to 2’ height above the platform.
Toilets : Anti-skid tiles flooring and wall tile up to 7ft heights from floor.Ceramic ware and C.P. fittings of standard
Doors : All Door frames of Sal wood, All Doors will be of commercial type flush doors with enamel painting and main door teak veneered with mortise lock and Eye-piece.
Windows : Windows frame are made up of Aluminum with MS grill & 4mm Glass panes.
Electrification : Electrical wiring, all copper wire in Concealed conduits, convenient Provisions of lights and power plugs as well as TV and telephone outlets.
Flooring : Vitrified/Porseleno tiles to be fixed in all rooms, balconies and halls.
Painting : Distemper finish over one coat of pop punning for interiors and cement paint for external wallsand enamel paint for doors.
Lift : One lift for six persons capacity having a reputed brand.
Break-up poweSupply : Power back-up for essential common services, as well as Guard & Society room.
Floor Plans
PDF File
Location
Payment
Booking Amount |
10% of the cost |
| On execution of Agreement & Allotment | 10% of the cost |
On completion of Foundation |
15% of the cost |
On completion of Stilt floor Roof Slab |
10% of the cost |
On completion of first floor Roof Slab |
10% of the cost |
On completion of Second floor Roof Slab |
10% of the cost |
On completion of Third floor Roof Slab |
10% of the cost |
Towards completion of brick work and plastering |
10% of the cost |
Towards completion of Flooring & finishing |
10% of the cost |
Upon completion and Before registration |
5% of the cost |
| Cost of Garage | : | Rs. 70,000.00 |
| Registration | : | As shall be applicable by law at the time of handing over possession. |
| Holding Tax | : | As shall be assessed by BMC at the time of handing over possession. |
| Electrification | : | Rs. 35,000.00 |
| Welfare Society | : | Rs. 10/- per Sq.Ft. of the total super built-up area of the flat towards security deposit with the owners welfare society. |












